Gunnison Copper Project

COMMODITY: Copper
LOCATION: Arizona, USA
SIZE: 9,560 Acres
OWNERSHIP:  100%
gunnisonMap
industry_photo1.jpg

Industry-Leading Economics

  • US$807 million NPV and 40% IRR (After-tax, US$2.75 Cu price, 7.5% discount rate)
  • Direct operating costs: $0.65/lb & All-in costs: $1.23/lb
  • Low initial capital of $49 million
  • 24 years of mine life
  • 2.2 billion pounds of pure copper cathode to be produced

Reserves

North Star Mineral Reserves

  Short Tons (millions) Total Copper % Pounds of Cu (billions)
Probable 782 0.29 4.5

 

North Star Mineral Resources (as of July 7, 2015)

  Short Tons (millions) Total Copper % Pounds of Cu (billions)
Measured 199 0.36 1.43
Indicated 674 0.27 3.57
Measured + Indicated 873 0.29 4.99
Inferred 187 0.17 0.63

The Mineral Resources (0.05% cut-off) are inclusive of Mineral Reserves (0.05% cut-off). The oxide and transition portion of the Mineral Reserve has the potential to be mined using in-situ recovery methods with an estimated total copper recovery of 48%.

northstarMap
wellfield.jpg

Johnson Camp Mine (JCM)

The 100% owned Johnson Camp Mine is located just over one mile from the wellfield; copper-bearing solution will be processed here through the SX-EW facility into 99.999% pure copper cathode. Purchased in 2015 for only US$8.4 million, JCM saves Excelsior millions of dollars in capex.

Environmentally Friendly Copper Extraction

  • Low water consumption (most groundwater is recycled)
  • No groundwater contamination; no acid mine drainage
  • Excellent mine closure plan
  • Remote location
20160425 110557
JakeJohnson 2866

Construction Timeline

The Gunnison Copper Project is the first new copper project to be fully permitted in the United States in over a decade. The federal Class III Underground Injection Control Area Permit was obtained on October 16, 2018. The state operating permit, the Aquifer Protection Permit, was issued by the Arizona Department of Environmental Quality in September, 2017

View Timeline

20160425_1105571.jpg

Corporate
Presentation

20180423_112314.jpg

Feasibility
Study

20160425_120624.jpg

In-situ
Recovery
Video

JakeJohnson 2866

Construction
Timeline